Wholesale Supply: ST255CS-2H PowerStack C&I Liquid-Cooled Energy Storage System | Commercial Energy Storage Cabinet | Global Delivery
Wholesale ST255CS-2H PowerStack C&I liquid-cooled BESS for your commercial projects. Features Tier-1 LFP cells, 10-year performance warranty, and turnkey global delivery. Maximize peak shaving ROI now.
Product Summary
Designed for high-throughput commercial and industrial (C&I) applications, the ST255CS-2H PowerStack C&I Liquid-Cooled Energy Storage System represents a paradigm shift in behind-the-meter energy economics. Unlike standard air-cooled cabinets, this unit integrates a proprietary smart liquid cooling architecture, delivering a usable energy capacity specifically tailored for peak shaving, demand charge management, and backup power for EV supercharging hubs. Engineered with Tier-1 LFP (LiFePO4) cells, the ST255CS-2H achieves over 8,000 cycle life at 90% Depth of Discharge (DoD), dramatically lowering the Levelized Cost of Storage (LCOE). As a direct wholesale supplier, we guarantee factory-direct pricing, UL 9540/IEC 62619 certification, and global sea freight readiness with local O&M support structures in key markets.

Why C&I Sourcing Chooses ST255CS-2H (High ROI)
Procurement managers and project developers consistently select this liquid-cooled BESS for its hard-dollar ROI predictability. The advanced thermal management ensures minimal cell-to-cell temperature variance (within ±1.5°C), preventing capacity degradation and enabling continuous 1C charge/discharge cycles without forced derating. This translates to a guaranteed 10-Year Performance Warranty retaining 80% of nameplate capacity. Furthermore, the system’s turnkey integration with PV canopies and existing diesel gensets provides immediate carbon reduction compliance. Our global supply chain and in-country warehousing partnerships ensure lead times as low as 4-6 weeks for palletized units, with full commissioning support provided via remote EMS handshake and local technician dispatch.
Product Overview & Safety Architecture
The ST255CS-2H integrates a multi-layer fire suppression system (aerosol + gas) with cell-level temperature fuses and a robust IP55-rated enclosure for outdoor deployment. The architecture features an active cell balancer capable of managing up to 200mV differentials, ensuring that each of the 240 series-connected LFP cells operates at its maximum potential. The EMS (Energy Management System) is pre-configured for 14 different market protocols (including IEEE 1547, VDE-AR-N 4105), enabling seamless micro-grid islanding or grid-tied peak shaving within 20ms transition time.
Technical Specifications
| Technical Feature | Specification |
|---|---|
| Battery Chemistry & Cell Tier | Tier-1 LFP (LiFePO4), Automotive Grade |
| Cooling / Thermal Control | Smart Liquid Cooling (Maintained ΔT < 1.5°C between cells) |
| Usable Energy Capacity | 255 kWh (C-Rate: 1C Continuous) |
| Max Charge/Discharge Power | 255 kW (PCS Integrated) |
| Cycle Life (EOL 80%) | 8,000 cycles @ 90% DoD, 25°C |
| Round-Trip Efficiency | 92.5% (DC/AC, including liquid cooling aux) |
| Safety Certifications | UL 9540A, UL 1973, IEC 62619, CE |
| Enclosure Protection | IP55 (Outdoor Rated) |
| Communication Protocols | Modbus TCP, CAN 2.0, OCPP 2.0.1 |
| Dimensions (WxDxH) | 1400mm x 1100mm x 2100mm |
| Warranty & Support | 10-Year Performance Warranty + 48h On-Site O&M |
Application Scenarios
EV Supercharging Stations & Industrial Parks
Deploy the ST255CS-2H behind an existing 500kVA transformer to buffer ultra-fast EV chargers. The liquid cooling system handles repetitive 255kW pulses from DC fast chargers without overheating, slashing demand charges by up to 40%. Simultaneously, the unit operates as a black start-capable micro-grid master for industrial parks, integrating directly with on-site solar PV and legacy diesel gensets. Its modular design allows parallel expansion up to 2MWh+ using a shared DC busbar, making it ideal for scalable zero-carbon factory initiatives.

Supply Assurance & Global O&M
We are a ISO 9001:2025 certified manufacturer with in-house production of both the battery modules and the power conversion system (PCS). Each ST255CS-2H undergoes a 72-hour factory acceptance test (FAT) and thermal run-away validation. Our logistics network covers over 40 countries, with DAP (Delivered at Place) terms available. We provide remote 24/7 EMS monitoring and guaranteed 48-hour on-site response for performance issues via our local certified O&M partners in North America, Europe, and Southeast Asia.
Frequently Asked Questions
- What is the typical ROI period for the ST255CS-2H in a peak shaving application?
- Based on real-world deployments in ISO 15118-compliant sites, the payback period ranges from 2.9 to 3.8 years in regions with demand charges above $15/kW. The liquid cooling system ensures consistent performance across the 10-year warranty horizon, directly accelerating ROI versus air-cooled alternatives.
- Does the system support third-party OCPP integration for EV charging?
- Yes. The integrated EMS is OCPP 2.0.1 compliant and includes native drivers for major EV charger brands (ABB, BTC, Delta). The ST255CS-2H can bi-directionally manage charging loads using local price signaling or grid capacity signals via the built-in 4G/Ethernet gateway.
- What is the exact parallel scalability of this liquid-cooled cabinet?
- Up to 8 units can be paralleled via a standardized 1500VDC busbar system, achieving a total system capacity of 2.04MWh / 2MW power. All cabinets share a single grid connection point, with the master unit controlling automated state-of-charge balancing across the fleet.
- How does the 10-year performance warranty handle capacity degradation?
- The warranty guarantees ≥80% of nominal energy retention (EOL) after 8,000 cycles (10 years @ 1 cycle/day) under standard operating temperatures (0-40°C). This is factory-backed with an escrow service agreement, and we provide annual remote capacity testing reports via the EMS.
- What certifications are already secured for global shipping?
- Complete UN38.3, IEC 62619 (for battery), UL 9540A (for thermal runaway), UL 1973, and CE/EMC compliance. We provide full documentation packs for local utility interconnection (including IEEE 1547 and VDE-AR-N 4105 test reports).







Reviews
There are no reviews yet.